Last Updated on February 7, 2025 by IPO Manthan Team
Mumbai Local Mega Block on 09th Feb 2025 due to critical maintenance work. The block will impact both Central Railway and Western Railway, leading to train delays, diversions, and cancellations. So that you know, passengers are advised to plan their travel accordingly.
Central Railway Mega Block Details
The mega block on 09th Feb 2025 will primarily impact the Up and Down Fast Lines between Matunga and Mulund from 11:30 AM to 3:30 PM.
Impact on Train Services (Central Railway)
Line | Affected Route | Timings | Changes | Expected Delay |
---|---|---|---|---|
Down Fast Line | CSMT to Mulund | 10:58 AM – 3:10 PM | Diverted to Down Slow Line at Matunga, stopping at all stations until Mulund | 15 minutes |
Up Fast Line | Thane to CSMT | 11:25 AM – 3:27 PM | Diverted to Up Slow Line at Mulund, stopping at all stations until Matunga | 15 minutes |
There will be no mega block on the Harbour Line (CSMT to Panvel) or the Trans Harbour Line (Thane to Panvel).
Western Railway Mega Block Details
Western Railway will implement a block from 1:40 AM to 7:10 AM on 09th Feb 2025 for key infrastructure projects. The block will affect train operations between:
- Virar & Vaitarna
- Saphale & Kelve Road
Affected Express Trains (Western Railway)
Train No. | Train Name | Origin | Destination | Change | Delay |
---|---|---|---|---|---|
22921 | Bandra Terminus – Gorakhpur Antyodaya Express | Bandra Terminus | Gorakhpur | Rescheduled | 1 hour |
22718 | Secunderabad – Rajkot Superfast Express | Secunderabad | Rajkot | Rescheduled | 1 hour |
22953 | Mumbai Central – Ahmedabad Gujarat Superfast Express | Mumbai Central | Ahmedabad | Rescheduled | 40 minutes |
20901 | Mumbai Central – Gandhinagar Capital Express | Mumbai Central | Gandhinagar | Regulated | 30 minutes |
Several local trains will also be cancelled due to this mega block.
Alternative Routes and Special Train Services
To minimize commuter inconvenience during the Mumbai local mega block on 09th Feb 2025, alternative routes and special train services will be available:
Line | Alternative Route | Timing |
---|---|---|
Harbour Line | Thane-Vashi/Nerul route | 10:00 AM – 6:00 PM |
Special Trains | CSMT-Kurla and Kurla-Panvel/Vashi | Throughout the day |
Passengers can use these options to reduce travel disruptions.
Why Mega Blocks Are Necessary
Mega blocks are essential for railway maintenance and infrastructure upgrades. The Mumbai local mega block on 09th Feb 2025 will facilitate:
Type of Work | Details |
---|---|
Platform Widening | Thane station’s platform 5/6 widened by 2-3 meters using 750 pre-cast hollow blocks. |
General Maintenance | Track and signaling system checks for better train performance. |
FOB Girder Launch | Foot Over Bridge (FOB) main girder installation. |
Bridge Construction | Western Railway bridge work between Bandra and Mahim. |
What Commuters Should Expect
On 09th Feb 2025, train services will be impacted as follows:
- Delays of 15 minutes on Central Railway (Matunga-Mulund).
- Local train cancellations on Western Railway.
- Rescheduled express trains on Western Railway.
- Alternative routes via Thane-Vashi/Nerul for Harbour Line passengers.
Conclusion
The Mumbai local mega block on 09th Feb 2025 is part of ongoing efforts to improve railway infrastructure and ensure safety. While it may cause temporary inconvenience, these upgrades will lead to better travel conditions in the long run. Commuters are advised to check live updates, use alternative routes, and plan additional travel time.